processing

In 2009, onix started the operations in Badr Factory; we used our latest technological industry machinery that includes:
• 4 Gang Saws
• 1 Block Cutters
• 4 Bridge Cutters
• Polishing Lines with Polyester and Epoxy Treatment
• Brushing lines
• 3 Tumbling machine
These technological machinery is used to finalize the marble construction of Badr factory. Badr Factory will boost the production capacity 30,000 m2/month by working on a two-shift basis; each shift is for 8 hours. The epoxy line will be the Group’s main market differentiator, with a production capacity of 30,000m2/month. The epoxy finish is the highest quality stone treatment that can utilize low quality blocks to produce high quality, value added products.